Pflugerville Epoxy Flooring installs epoxy flooring in Bastrop, and this city is genuinely different from everywhere else in its county. Inside these city limits a floor job stands on a permit, an adopted code edition and a named building official, and the same job one street outside the line has none of those things.
We have been coating concrete across Central Texas for more than 20 years, and most of the communities in this part of our service area are unincorporated, where a coating on an existing slab has nothing public to apply for. Here there is a municipal building department, and on commercial work that changes the whole shape of a project.
It also means the city line is a real regulatory boundary rather than a line on a map. A job on one side of it and a job on the other are administered by different systems entirely, and a mailing address is no guide to which one you are on.
What a Permit Actually Buys on a Commercial Floor

An Adopted Code and a Named Official
This is the one place in its county with an adopted building code, a permit process and a building official who can be named. The adopted codes are the 2018 International series with the 2017 National Electrical Code.
For a commercial coating job that means a fire code and a building code with editions attached, a review with somebody accountable for it, and an inspection record at the end. That is more paperwork than an unincorporated job and it is a better-documented result.
It also gives a specification somewhere to be tested. A reviewer who can ask what system is going down, at what thickness and over what preparation is a reviewer who makes an under-built floor harder to sell, which works in a building owner’s favor rather than against it.
Why Documentation Is Worth Something
On a commercial building a coated floor is frequently the last trade in before occupancy, and it is the surface everyone looks at afterward. A permitted job leaves a record of what was reviewed and inspected, which matters to a landlord, a lender or a buyer years later.
We produce the same package regardless: product data sheets, safety data sheets, the coat-by-coat system build, the finished mil thickness and the cure and return-to-service schedule. In this city that documentation has somewhere official to go rather than living only in your file.
The City Line Cuts Both Ways
The corollary is that the same building type a few streets outside the limits has no adopted building code over it at all. That is not a reason to work differently, and it is a reason to be clear with a customer about what they are and are not getting.
We confirm which side of the line a job sits on before quoting rather than reading it off an address. Several well-known facilities carry a Bastrop mailing address and sit in unincorporated county, and treating the envelope as the jurisdiction is the standard way to get this wrong.
On a residential garage the difference rarely changes what happens, since a coating on an existing slab generally has nothing to apply for either way. On commercial work it changes everything about the sequence, which is why we settle it before quoting rather than after.
Looking for epoxy-flooring closer to Circle D-KC Estates? See Epoxy-Flooring in Circle D-KC Estates.
The Insurance Floor the City Checks
A Published Minimum
The city requires proof of contractor liability insurance of at least $200,000 combined for property damage and bodily injury and $200,000 aggregate for products and completed operations before it will issue a permit.
That is a published, checkable floor, and it is unusual for a city this size to state one so plainly. It also means an uninsured or underinsured contractor cannot pull a permit here, which is a genuine consumer protection rather than a formality.
What We Carry, and Why It Is Not a License
We carry general liability cover and workers compensation and we send certificates before the job rather than on request, along with a Texas sales and use tax permit. All three are documents you can verify with the issuer rather than take on trust, which is the entire point of asking for them.
What none of them is, is a license. Texas licenses no flooring, coatings, painting or general contractor, so there is no license number to hold and any company offering you one for floor coating work is offering something that does not exist.
Making the Comparison Fair
The other document worth insisting on is the specification. Our proposal names the product, the coat-by-coat system build and the finished mil thickness, which is what makes two quotes comparable rather than merely similar-looking.
Two proposals for an epoxy floor can differ by half the material and read almost identically. Mil build and spread rate are the only honest measure of what you bought, and written that way the finished floor can be checked against what was quoted.
We also read the warranty exclusions out before a job is sold, with substrate movement and moisture named first. Both are conditions of the slab rather than defects in a product, and moisture is the one you can measure and price for in advance rather than argue about afterward.
Where the Commercial Floors Actually Are
The Stock Inside the City Limits
The appraisal district’s certified totals record several hundred commercial real property accounts inside the city limits. The confirmed stock includes a hospital and an emergency center, a supermarket, a supercenter, a home improvement store, a retail crossing, eight hotel properties and a dozen automotive service sites.
That is a hospitality, healthcare, retail and automotive mix rather than an industrial one. Industrial property inside the city limits is nearly absent, with only a handful of accounts against a much larger countywide figure, so this is not an industrial or manufacturing town and we will not describe it as one.
What Each of Those Needs
Hotel and healthcare floors are cleanability and chemical-resistance problems bought on shutdown windows that do not move, with back-of-house kitchens requiring an integral coved base at wall junctures and a surface built to the health code’s smooth, durable and easily cleanable requirement.
Automotive service bays are a different specification again. They live with motor oil, coolant, brake fluid, battery acid and dropped tools, so they get a chemical-resistant system at a real mil build, a topcoat chosen against the specific chemistry, and enough texture to stay safe once something has been spilled.
A Housing Stock With Both Ends
The residential picture here is unusual too. Roughly 49.8 percent of the housing stock dates to 2000 or later while about 12.6 percent dates to 1939 or earlier, with the 1990s the thinnest decade at around 372 units.
So there is a substantial modern stock and a genuinely old core, and very little in between. Mobile homes are only about 1.8 percent of the stock here, which makes this a conventional slab-and-frame housing base rather than the manufactured-housing pattern common elsewhere in the county, and the addressable owner-occupied detached pool runs to roughly 2,607 houses.
Booking Around the City’s Own Clock
Submission Days and Notice Periods
Building permit applications are submitted on Mondays before 4:00 p.m. while trade permits are accepted any day. Fire inspections require 48 hours notice, and other inspections are typically next day with a 3:00 p.m. cutoff.
Those are real numbers to plan around rather than rules of thumb. A missed Monday is a week on a building permit, and a fire inspection booked without two days notice is a fire inspection that does not happen when you needed it.
The city was also listed extensively in the National Register in 1978, with 131 buildings and sites recorded, so the older core carries a genuine historic building stock. That is context for the kind of concrete a commercial job downtown is likely to be standing on rather than a separate review step.
Sequencing a Coating Against Them
Floor coatings sit late in a construction sequence with an occupancy date behind them, which is exactly when a missed submission window costs the most. We build the schedule backward from the inspection dates rather than forward from crew availability.
Cure time is the part that cannot be compressed. We give a working date and a separate full-service date in writing, because a topcoat that feels hard underfoot has not finished cross-linking and putting traffic on it early is how a new floor gets damaged in its first week.
Site Conditions Worth Knowing
Two local conditions come up on jobs here. The county issues periodic countywide outdoor burning bans, violation of which is a Class C misdemeanor with a fine attached, and whether one is in force is a live lookup rather than a fixed answer.
The other is the pine canopy that runs through the older neighborhoods and adjoins the city. Pine needle litter on and around a slab is a real site condition for a coating crew, because anything that lands in a wet coat stays in it permanently, so containment and covering matter more here than on an open suburban lot. On an exterior job in particular we plan the working area and the shelter before the first pail is opened.
- 20+ Years in Central Texas
- Insured & Workers Comp Covered
- Free Written Estimates











